FJ Cruiser 2WD V6-4.0L (1GR-FE) (2008)
8. INSTALL PARKING BRAKE HOLE COVER SUB-ASSEMBLY See: Body and Frame/Interior Moulding / Trim/Dashboard / Instrument
Panel/Service and Repair/Installation
9. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY (for Manual Transaxle) See: Body and Frame/Interior Moulding / Trim/Dashboard /
Instrument Panel/Service and Repair/Installation
10. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY (for 4WD) See: Body and Frame/Interior Moulding / Trim/Dashboard / Instrument
Panel/Service and Repair/Installation
11. INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY See: Body and Frame/Interior Moulding / Trim/Dashboard / Instrument
Panel/Service and Repair/Installation
12. INSTALL INSTRUMENT PANEL GARNISH RH See: Body and Frame/Interior Moulding / Trim/Dashboard / Instrument Panel/Service and
Repair/Installation
13. INSTALL INSTRUMENT PANEL GARNISH LH See: Body and Frame/Interior Moulding / Trim/Headliner/Service and Repair/Installation
14. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 3.9 Nm (40 kgf-cm, 35 in-lbf)
15. PERFORM INITIALIZATION
(a) Perform initialization See: Testing and Inspection/Programming and Relearning.
HINT: Some systems need initialization after reconnecting the cable to the negative battery terminal.
16. INSPECT SRS WARNING LIGHT
(a) Inspect the SRS warning light See: Testing and Inspection/Initial Inspection and Diagnostic Overview/Diagnosis System.