FJ Cruiser 2WD V6-4.0L (1GR-FE) (2008)
09820-06010
09820-06020
HINT
(a) Install the pulley onto the rotor shaft by tightening the pulley nut by hand.
(b) Hold SST 1-A with a torque wrench, and tighten SST 1-B clockwise with the specified torque.
Torque: 39 Nm (400 kgf-cm, 29 ft-lbf)
NOTE: Check that SST is secured to the rotor shaft.
(c) Mount SST 2 in a vice.
(d) Insert SST 1-A and B into SST 2, and attach the pulley nut to SST 2.
(e) Tighten the pulley nut by turning SST 1-A in the direction shown in the illustration.
Torque: 111 Nm (1,132 kgf-cm, 82 ft-lbf)
(f) Remove the generator from SST 2.
(g) Turn SST 1-B, and remove SST 1-A and B.
(h) Turn the pulley, and check that the pulley moves smoothly.