FJ Cruiser 2WD V6-4.0L (1GR-FE) (2008)
4. INSTALL TIE ROD END SUB-ASSEMBLY LH
(a) Install the tie rod end onto the steering knuckle arm.
(b) Install the nut.
Torque: 91 Nm (928 kgf-cm, 67 ft-lbf)
(c) Install a new cotter pin.
5. INSTALL TIE ROD END SUB-ASSEMBLY RH
HINT: The installation procedure for the RH side is the same as that for the LH side.
6. INSTALL NO. 2 STEERING INTERMEDIATE SHAFT
(a) Align the matchmarks on the No. 2 steering intermediate shaft and power steering link.
(b) Install the No. 2 steering intermediate shaft onto the power steering link with bolt C.
Torque: 36 Nm (367 kgf-cm, 27 ft-lbf)
(c) Align the matchmarks on the steering intermediate shaft and steering sliding yoke.
(d) Install the steering sliding yoke onto the steering intermediate shaft and slide it upward.
(e) Align the matchmarks on the steering sliding yoke and No. 2 steering intermediate shaft.
(f) Install the steering sliding yoke with bolts A and B.
Torque: 36 Nm (367 kgf-cm, 27 ft-lbf)
7. INSTALL FAN AND GENERATOR V BELT See: Engine, Cooling and Exhaust/Engine/Drive Belts, Mounts, Brackets and Accessories/Drive
Belt/Service and Repair/Installation
8. INSTALL FRONT WHEELS
Torque: 113 Nm (1,152 kgf-cm, 83 ft-lbf)
9. PLACE FRONT WHEELS FACING STRAIGHT AHEAD
10. INSPECT STEERING WHEEL CENTER POINT
11. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 3.9 Nm (40 kgf-cm, 35 in-lbf)
12. ADD POWER STEERING FLUID
13. BLEED POWER STEERING FLUID See: Testing and Inspection/Component Tests and General Diagnostics/Power Steering System
14. CHECK FOR POWER STEERING FLUID LEAKAGE
15. INSPECT AND ADJUST FRONT WHEEL ALIGNMENT
See: Alignment/Service and Repair
16. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY See: Engine, Cooling and Exhaust/Engine/Drive Belts, Mounts, Brackets and
Accessories/Drive Belt/Service and Repair/Installation