toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Compression Check > < On-Vehicle Inspection|Page 1535
Page 1
background image

Variable Valve Timing Actuator: Service and Repair

REMOVAL 

1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL
2. DRAIN ENGINE COOLANT
3. REMOVE V-BANK COVER
4. REMOVE AIR CLEANER ASSEMBLY
5. REMOVE THROTTLE BODY BRACKET
6. REMOVE OIL BAFFLE PLATE
7. REMOVE NO. 1 SURGE TANK STAY
8. REMOVE NO. 2 SURGE TANK STAY
9. REMOVE INTAKE AIR SURGE TANK

10. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY

a. Disconnect the 2 connectors.
b. Remove the 2 bolts, then remove the 2 camshaft timing oil control valves.

INSTALLATION 

1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY

a. Install the 2 camshaft timing oil control valves with the 2 bolts.

Torque: 9.0 N.m (92 kgf.cm, 80 in.lbf) 

b. Connect the 2 connectors.

2. INSTALL INTAKE AIR SURGE TANK
3. INSTALL NO. 2 SURGE TANK STAY
4. INSTALL NO. 1 SURGE TANK STAY
5. INSTALL OIL BAFFLE PLATE
6. INSTALL THROTTLE BODY BRACKET
7. INSTALL AIR CLEANER ASSEMBLY
8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque: 3.9 N.m (40 kgf.cm, 35 in.lbf) 

9. ADD ENGINE COOLANT

10. CHECK FOR ENGINE COOLANT LEAKAGE
11. INSTALL V-BANK COVER

Compression Check > < On-Vehicle Inspection|Page 1535