FJ Cruiser 4WD V6-4.0L (1GR-FE) (2007)
Torque: 54 N*m (551 kgf*cm, 40 ft.*lbf.)
26. INSTALL VANE PUMP ASSEMBLY
(a)
Install the vane pump with the 2 bolts.
Torque: 43 N*m (438 kgf*cm, 32 ft.*lbf.)
NOTICE: Do not hit the pulley with other parts when installing the vane pump.
(b) Connect the power steering pressure switch connector.
27. INSTALL OIL LEVEL GAUGE GUIDE
(a)
Install a new O-ring onto the oil level gauge guide.
(b) Apply a light coat of engine oil to the O-ring.
(c)
Push the oil level gauge guide end into the guide hole in the oil pan.
(d) Install the oil level gauge guide with the bolt.
Torque: 9.0 N*m (92 kgf*cm, 80 in.*lbf.)
(e)
Install the oil level gauge guide.
28. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY
NOTICE: The bolt in position A is not reusable.
HINT: Each bolt length is as follows: