Removal and Replacement of HVAC Housing Assembly on FJ Cruiser 4WD V6-40L (1GR-FE)
67. INSTALL COOLER REFRIGERANT LIQUID PIPE A
68. INSTALL COOLER REFRIGERANT SUCTION PIPE A
69. INSTALL COWL TOP VENTILATOR LOUVER LH
70. INSTALL COWL TOP VENTILATOR LOUVER RH
71. INSTALL COWL TOP VENTILATOR LOUVER SUBASSEMBLY
72. INSTALL FRONT FENDER SIDE PANEL UPPER LH
73. INSTALL FRONT FENDER SIDE PANEL UPPER RH
74. INSTALL ANTENNA ORNAMENT
75. INSTALL ROOF ANTENNA POLE SUB-ASSEMBLY
76. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY LH
77. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY RH (CENTER SIDE)
78. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY RH
79. INSTALL WINDSHIELD WIPER ARM COVER
80. ADD ENGINE COOLANT
81. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 3.9 N.m (40 kgf.cm, 35 in.lbf)
82. CHECK SRS WARNING LIGHT
83. CHARGE REFRIGERANT
84. WARM UP ENGINE
85. CHECK FOR ENGINE COOLANT LEAKAGE
86. CHECK FOR REFRIGERANT LEAKAGE
87. POSITION FRONT WHEELS FACING STRAIGHT AHEAD