FJ Cruiser 4WD V6-4.0L (1GR-FE) (2007)
Transmission Position Switch/Sensor: Testing and Inspection
Park / Neutral Position Switch Inspection
INSPECTION
1. INSPECT PARK/NEUTRAL POSITION SWITCH
(a)
Measure the resistance of the PNP switch when the shift lever is moved to each position.
Standard resistance