toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Power Window Switch > < Heated Glass Element Switch|Locations|Page 1027
Page 2
background image

a. Remove the 2 screws.
b. Disengage the 4 clips and remove the integration control and panel.

INSTALLATION

1. INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY

a. Engage the 4 clips and install the integration control and panel.
b. Install the 2 screws.

2. INSTALL INSTRUMENT PANEL GARNISH LH
3. INSTALL INSTRUMENT PANEL GARNISH RH
4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque: 3.9 N.m (40 kgf.cm, 35 in.lbf)

Power Window Switch > < Heated Glass Element Switch|Locations|Page 1027