Highlander LTD 2WD V6-3.0L (1MZ-FE) (2002)
5. INSTALL RADIATOR SIDE SUPPORT
6. INSTALL RADIATOR UPPER SUPPORT
7. MEASURING THE ENGINE COMPARTMENT DIMENSIONS
8. APPLYING SEALER TO THE ENGINE COMPARTMENT
9. APPLYING UNDER COATING
10. APPLYING ANTI-RUST AGENT
a. After applying the top coat layer, apply the anti-rust agent to the inside of the necked section structural weld spots.