toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Body and Frame|Frame > < Front Fender Apron (Assembly)|Page 4962
Page 2
background image

5. INSTALL RADIATOR SIDE SUPPORT
6. INSTALL RADIATOR UPPER SUPPORT
7. MEASURING THE ENGINE COMPARTMENT DIMENSIONS
8. APPLYING SEALER TO THE ENGINE COMPARTMENT
9. APPLYING UNDER COATING

10. APPLYING ANTI-RUST AGENT

a. After applying the top coat layer, apply the anti-rust agent to the inside of the necked section structural weld spots.

Body and Frame|Frame > < Front Fender Apron (Assembly)|Page 4962