Highlander LTD 2WD V6-3.0L (1MZ-FE) (2002)
36. INSTALL SKID CONTROL ECU ASSY
a. Install the 2 nuts and skid control ECU assy.
Torque: 5.0 N.m (50 kgf.cm, 43 in.lbf)
37. INSTALL INSTRUMENT PANEL JUNCTION BLOCK ASSY
a. Install the instrument panel junction block assy, bolt and 2 nuts.
Torque: 8.4 N.m (86 kgf.cm, 74 in.lbf)
38. INSTALL ECM
a. Install the ECM and 2 nuts.
Torque: 5.5 N.m (56 kgf.cm, 49 in.lbf)
39. INSTALL INSTRUMENT PANEL BRACE SUB-ASSY NO.2
a. Install the instrument panel brace sub-assy No.2, 2 bolts and 2 nuts.
Torque: 29 N.m (300 kgf.cm, 21 ft.lbf)