Landcruiser 4WD L6-4.5L (1FZ-FE) (1993)
-
Temporarily install the 3 bolts holding the delivery pipe to the intake manifold.
-
Check that the injectors rotate smoothly.
HINT: If injectors do not rotate smoothly, the probable cause is incorrect installation of 0 - rings. Replace the 0 - rings.
-
Position the injector connector upward.
-
Tighten the 3 bolts holding the delivery pipe to the intake manifold.
Torque: 21 Nm (15 ft lb)
-
Connect the 6 injector connectors as shown.