toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Shift Linkage, M/T > < Shifter M/T|Removal|Page 3577
Page 3
background image

(a) Connect the select cable to the shift lever assembly.

-

The projecting part of the cable outer should face upward when the shift cable is installed.

-

Make sure that after installation the cable outer spring is moved to the place shown in the illustration.

(b) Connect the select cable end with the clip to the shift lever assembly.
(c) Connect the select cable to the clamp.

3. CONNECT FLOOR SHIFT CABLE TRANSMISSION CONTROL SHIFT

(a) Connect the shift cable with the clip to the shift lever assembly.

-

The projecting part of the cable outer should face upward when the shift cable is installed.

-

Make sure that after installation the cable outer spring is moved to the place shown in the illustration.

(b) Connect the shift cable end as shown in the illustration.
(c) Install the washer and clip.
(d) Connect the shift cable to the clamp.

4. INSTALL INSTRUMENT PANEL FINISH PANEL LOWER CENTER (See: Body and Frame/Interior Moulding / Trim/Dashboard / Instrument

Panel/Service and Repair/Installation)

5. INSTALL INSTRUMENT PANEL BOX (See: Body and Frame/Interior Moulding / Trim/Dashboard / Instrument Panel/Service and

Repair/Installation)

6. INSTALL INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY CTR (See: Body and Frame/Interior Moulding / Trim/Dashboard /

Instrument Panel/Service and Repair/Installation)

7. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY

Shift Linkage, M/T > < Shifter M/T|Removal|Page 3577