Matrix FWD L4-2.4L (2AZ-FE) (2009)
(a) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
If the value is not as specified, replace the shift solenoid valve SL2.
(b) Connect a positive (+) lead with a 21 W bulb to terminal 2 and a negative (-) lead to terminal 1 of the solenoid valve connector, and check the
operation of the valve.
NOTE: When using battery voltage during the inspection, do not bring the positive and negative tester probes too close to each other as a
short circuit may occur.
OK:
The solenoid valve makes an operating sound.
If the operation cannot be done as specified, replace the shift solenoid valve SL2.
7. INSPECT SHIFT SOLENOID VALVE SL1
(a) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
If the value is not as specified, replace the shift solenoid valve SL1.
(b) Connect a positive (+) lead with a 21 W bulb to terminal 2 and a negative (-) lead to terminal 1 of the solenoid valve connector, and check the