Matrix FWD L4-2.4L (2AZ-FE) (2009)
(a) Install the No. 1 front floor heat insulator with the 3 nuts.
Torque: 5.5 Nm (56 kgf-cm, 49 in-lbf)
14. INSTALL CENTER EXHAUST PIPE ASSEMBLY See: Engine, Cooling and Exhaust/Exhaust System/Exhaust Pipe/Service and
Repair/Installation
15. INSTALL AIR CLEANER CASE See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and Replacement/Engine
Assembly/Installation
16. INSTALL AIR CLEANER CAP SUB-ASSEMBLY See: Powertrain Management/Fuel Delivery and Air Induction/Throttle Body/Service and
Repair/Installation
17. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and
Replacement/Engine Assembly/Installation
18. INSPECT FOR EXHAUST GAS LEAK