toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Floor Shift Cable Transmission Control Shift Replacement|Page 3527 > < Floor Shift Cable Transmission Control Shift Replacement|Page 3525
Page 3
background image

a. Pull in the shift cable to the floor.

b. Install the shift cable grommet retainer with the 2 bolts. 

Torque: 5.0 Nm (51 kgf-cm, 44 inch lbs.) 

c. Connect the shift cable to the shift lever assy.

NOTICE: 
^

The projecting part of the cable outer should face upward when the shift cable is installed.

^

Make sure that after installation the cable outer spring is moved to the place shown in the illustration.

d. Connect the shift cable end as shown in the illustration.
e. Install the washer and clip.
f.

Connect the shift cable to the clamp.

g. Connect the shift cable with the 2 nuts.

Torque: 5.0 Nm (51 kgf-cm, 44 inch lbs.) 

Floor Shift Cable Transmission Control Shift Replacement|Page 3527 > < Floor Shift Cable Transmission Control Shift Replacement|Page 3525