MR2 L4-132 2164cc 2.2L DOHC (5S-FE) (1993)
Shift Interlock Solenoid: Testing and Inspection
Shift Lock Solenoid
1. Disconnect solenoid connector.
2. Using suitable ohmmeter, measure resistance between both terminals.
Resistance should be: 21 - 27 Ohms
3. Apply battery positive voltage between terminals and ensure solenoid operating noise can be heard.