MR2 Spyder L4-1.8L (1ZZ-FE) (2001)
4. DISCONNECT PRESSURE FEED TUBE
Using SST, disconnect the pressure feed tube.
SST 09023-12700
5. REMOVE POWER STEERING VANE PUMP
Remove the 2 bolts, nut, 3 washers and power steering vane pump.
INSTALLATION
1. INSTALL POWER STEERING VANE PUMP
Install the power steering vane pump with the 2 bolts, nut and 3 washers.
Torque: 19 Nm (190 kgf-cm, 14 ft. lbs.)
2. CONNECT PRESSURE FEED TUBE
Using SST, connect the pressure feed tube.
SST 09023-12700
Torque: 39.5 Nm (400 kgf-cm, 29 ft. lbs.)
HINT: Use a torque wrench with a fulcrum length of 345 mm (11.81 inch).
3. CONNECT RETURN HOSE
Connect the return hose with the clip.
4. CONNECT ECU CONNECTORS
5. BLEED POWER STEERING SYSTEM
6. INSTALL LUGGAGE COMPARTMENT TRIM BOX COVER