Assembly

During assembly, coat all moving parts, bearings and bushings with molybdenum disulfide lithium base grease, and all O-rings and Teflon rings with 
power steering fluid.

1.

Install rack housing cylinder side oil seal and spacer by coating new oil seal with power steering fluid, then install oil seal and spacer to suitable
tool, and drive into cylinder.

2.

Install suitable tool onto rack assembly, coat tool with power steering fluid, then remove tool.

3.

Install new O-ring onto the rack bushing, then install rack bushing in the rack cylinder.

4.

Push cylinder end stopper into rack cylinder until wire installation hole appears. Insert a new wire end into hole, then using suitable tool, turn
cylinder end stopper clockwise until wire end disappears.

5.

Ensure cylinder is air tight. Connect suitable tool, to union of cylinder housing, then apply 15.75 inches Hg vacuum for at least 30 seconds. There
should be no drop in vacuum.

6.

Install control valve assembly as follows:
a. Push control valve into housing.
b. Using suitable tool, press in the upper bearing.
c. Using suitable tool press in oil seal until snug with bearing.
d. Install snap ring, then dust cover.

7.

Using suitable tool, install self-locknut into lower control valve housing. Torque nut to specifications.

8.

Apply Loctite 242 or equivalent to rack housing cap, then install cap, tighten to specifications. Using a center punch, stake the housing cap at
opposite ends of cap.

9.

Install rack guide and rack guide spring.

10.

Adjust total preload as follows:
a. Apply Loctite 242 or equivalent, to spring cap, then using suitable tool, install into housing, tighten cap to specifications.
b. Turn the spring cap counter clockwise 12°, then rotate control valve shaft right then left twice.
c. Loosen the spring cap until rack guide compression spring is not functioning.
d. Using tool No. 09616-00010 with torque wrench on control valve shaft, turn spring cap until preload of 7.8-12.0 inch lbs. is obtained.

11.

Apply Loctite 242 or equivalent, to spring cap locknut, then install locknut and tighten specifications. Recheck preload as specified in previous
step.

12.

Install new rack end claw washers, then rack ends. Torque rack ends to specifications.

13.

Stake claw washers into position, then ensuring that tube hole is not clogged with grease, install rack boots, clamps and clips. Ensure clip ends face
outward.

14.

Install tie-rod ends, ensuring marks made during disassembly are aligned. After adjusting toe-in, tighten locknuts to specifications.

15.

Install new pressure line O-rings, then the pressure lines. Torque to specifications.

16.

Install air control valve. Tighten to specifications.