Paseo L4-1497cc 1.5L DOHC (5E-FE) (1992)
Ball Joint: Testing and Inspection
1.
Remove ball joint, refer to LOWER BALL JOINT.
2.
Move ball joint stud back and forth five times then install nut.
3.
Using torque wrench, turn nut continuously one turn per 2-4 seconds and take torque reading on fifth turn.
4.
If torque reading is not 9-29 inch lbs., replace ball joint.