toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Cool Box Evaporator|Page 2785 > < Cool Box Evaporator|Page 2783
Page 4
background image

     

3. CONNECT LIQUID LINE TUBE TO COOLING UNIT INLET FITTING    

Torque: 14 ± 1.0 N.m (140 ± 10 kgf.cm, 10 ± 0.7 ft.lbf) 

4. IF EVAPORATOR WAS REPLACED, ADD COMPRESSOR OIL TO COMPRESSOR

Add 40-50 cc (1 .4-1.7 ft. oz.)
Compressor oil:

DENSO OIL 6,
SUNISO No.5 GS or equivalent
 

5. CONNECT RIGHT AND LEFT DRAIN HOSES
6. CONNECT NEGATIVE CABLE TO BATTERY
7. EVACUATE AIR FROM AIR CONDITIONING SYSTEM
8. CHARGE AIR CONDITIONING SYSTEM WITH REFRIGERANT AND CHECK FOR GAS LEAKAGE 

Specified amount: 1,200 ± 50 g (42.32 ± 1.76 oz.) 

Cool Box Evaporator|Page 2785 > < Cool Box Evaporator|Page 2783