Previa Van RWD L4-148.8 2438cc 2.4L DOHC SC (2TZ-FZE) (1996)
-
(1) Air connector vent pipe.
-
(2) Air hose for A/C idle-up valve.
-
(3) Air ventilation pipe.
4. Install air cleaner cap and mass air flow meter.
-
Connect the air cleaner hose with the clamp.
-
Install the air cleaner cap and mass air flow meter with the 4 clips.
5. Refill with engine coolant.
6. Connect negative (-) terminal cable to battery.