Prius L4-1.5L (1NZ-FXE) (Hybrid) (2003)
6. INSTALL BATTERY ECU
a. Install the battery ECU with the 2 bolts.
Torque: 3.3 N.m (33 kgf.cm, 29 in.lbf)
b. Connect the connector for HV battery thermistor.
7. INSTALL BUSBAR MODULE
a. Install the front busbar module with the 74 nuts.
Torque: 6.0 N.m (61 kgf.cm, 53 in.lbf)
b. Install the rear RH and LH busbar modules with the 74 nuts.
Torque: 6.0 N.m (61 kgf.cm, 53 in.lbf)
8. INSTALL SMR
a. Install the SMR with the 3 bolts.
Torque: 5.0 N.m (50 kgf.cm, 44 in.lbf)
b. Connect the power cable for SMR with the 2 bolts.
Torque: 5.0 N.m (50 kgf.cm, 44 in.lbf)
c. Install the SMR cover to the SMR.
d. Connect the connector to the cover for external uniform charger and lock the cover.