Sequoia 2WD V8-4.6L (1UR-FE) (2010)
(e) Connect the 2 wire harness clamps.
HINT
When installing the hose, make sure the paint mark and clip are as shown in the illustration.
(f) Connect the water by-pass hose and 2 connectors.
HINT
When installing the hose, make sure the paint mark and clip are as shown in the illustration.
4. ADD ENGINE COOLANT See: Coolant/Service and Repair
5. INSPECT FOR COOLANT LEAK See: Testing and Inspection
6. INSTALL AIR CLEANER ASSEMBLY See: Powertrain Management/Ignition System/Ignition Coil/Service and Repair/Installation
7. INSTALL V-BANK COVER SUB-ASSEMBLY See: Engine/Service and Repair/Removal and Replacement/Engine Assembly/Installation
8. INSTALL NO. 1 ENGINE UNDER COVER See: Engine/Engine Lubrication/Engine Oil/Service and Repair/Replacement