Sequoia 2WD V8-4.6L (1UR-FE) (2010)
(a) Remove the 3 bolts and starter cover.
3. REMOVE STARTER ASSEMBLY
(a) Disconnect the 2 wire harness clamps.
(b) Disconnect the starter connector.
(c) Remove the nut and disconnect the starter wire.
(d) Remove the 2 bolts and starter.
(e) Remove the flywheel housing side cover.
Installation
1UR-FE STARTING: STARTER (for 2.0 kW Type): INSTALLATION
1. INSTALL STARTER ASSEMBLY
(a) Install the flywheel housing side cover.
(b) Install the starter with the 2 bolts.
Torque : 37 Nm (377 kgf-cm, 27 ft-lbf)
(c) Connect the starter wire with the nut.