Sequoia 2WD V8-4.7L (2UZ-FE) (2003)
Install the upper suspension arm with 2 washers, bolt and nut.
Torque: 98 Nm (1,000 kgf-cm, 72 ft. lbs.)
HINT: After stabilizing the suspension, torque the nut.
2. INSTALL BRAKE AND FUEL LINE CLAMP
Torque: 5.5 Nm (56 kgf-cm, 49 inch lbs.)
3. INSTALL FENDER APRON SEAL REAR
4. CONNECT UPPER BALL JOINT
a. Connect the upper ball joint to the upper suspension arm.
b. Install the nut and a new cotter pin.
If the holes for the cotter pin are not aligned, tighten the nut further up to 60°.
Torque: 105 Nm (1,100 kgf-cm, 77 ft. lbs.)
5. CONNECT SPEED SENSOR WIRE HARNESS CLAMPS
Torque: 8.0 Nm (82 kgf-cm, 71 inch lbs.)
6. INSTALL SHOCK ABSORBER WITH COIL SPRING
7. CHECK FRONT WHEEL ALIGNMENT
8. PERFORM ZERO POINT CALIBRATION OF STEERING ANGLE, MASTER CYLINDER PRESSURE, YAW RATE AND
DECELERATION SENSORS See: Brakes and Traction Control/Antilock Brakes / Traction Control Systems/Testing and Inspection/Component
Tests and General Diagnostics/ABS W/EBD & BA & TRAC & VSC System/Zero Point Calibration of Sensors
