Sequoia 4WD V8-4.6L (1UR-FE) (2010)
Dimmer Switch: Service and Repair
Installation
METER / GAUGE / DISPLAY: LIGHT CONTROL RHEOSTAT: INSTALLATION
1. INSTALL LIGHT CONTROL RHEOSTAT
(a) Engage the 2 claws to install the light control rheostat.
2. INSTALL INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY See: Body and Frame/Interior Moulding / Trim/Dashboard / Instrument
Panel/Service and Repair/Installation
3. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY LH See: Body and Frame/Interior Moulding / Trim/Dashboard
/ Instrument Panel/Service and Repair/Installation
4. INSTALL INSTRUMENT SIDE PANEL LH See: Body and Frame/Interior Moulding / Trim/Dashboard / Instrument Panel/Service and
Repair/Installation
5. INSTALL COWL SIDE TRIM BOARD LH See: Body and Frame/Interior Moulding / Trim/Headliner/Service and Repair/Installation
6. INSTALL FRONT DOOR SCUFF PLATE LH See: Body and Frame/Interior Moulding / Trim/Headliner/Service and Repair/Installation