toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 3331 > < Initial Inspection and Diagnostic Overview|Page 3329
Page 11
background image

INSPECTION PROCEDURE

PROCEDURE

1. CHECK HARNESS AND CONNECTOR (ECM - BATTERY AND BODY GROUND)

(a) Disconnect the A27 and D56 ECM connectors.

(b) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

(c) Measure the voltage according to the value(s) in the table below.

Standard Voltage:

Initial Inspection and Diagnostic Overview|Page 3331 > < Initial Inspection and Diagnostic Overview|Page 3329