toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Air Switching Valve (for Bank 1)|Page 3745 > < Air Switching Valve (for Bank 1)|Page 3743
Page 2
background image

1UR-FE EMISSION CONTROL: AIR SWITCHING VALVE (for Bank 2): REMOVAL

1. REMOVE V-BANK COVER SUB-ASSEMBLY   See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and

Replacement/Engine Assembly/Removal

2. REMOVE AIR CLEANER HOSE ASSEMBLY   See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and

Replacement/Engine Assembly/Removal

3. DISCONNECT NO. 3 VENTILATION HOSE

(a) Disconnect the No. 3 ventilation hose.

4. DISCONNECT NO. 1 AIR HOSE

(a) Disconnect the No. 1 air hose.

5. REMOVE AIR SWITCHING VALVE ASSEMBLY

(a) Disconnect the connector and clamp.

(b) Remove the bolt and disconnect the wire harness clamp bracket.

(c) Remove the 2 bolts.

(d) Remove the 3 bolts, air switching valve and gasket.

NOTICE:
Be careful not to damage the installation surface of the gaskets.

Installation

1UR-FE EMISSION CONTROL: AIR SWITCHING VALVE (for Bank 2): INSTALLATION

Air Switching Valve (for Bank 1)|Page 3745 > < Air Switching Valve (for Bank 1)|Page 3743