Sequoia 4WD V8-4.6L (1UR-FE) (2010)
(b) Using SST and a hammer, tap out the bearing.
SST : 09950-60010
09951-00250
SST : 09950-70010
09951-07100
Reassembly
1UR-FE BATTERY / CHARGING: GENERATOR: REASSEMBLY
1. REMOVE GENERATOR DRIVE END FRAME BEARING
(a) Using SST and a press, press in a new bearing.
SST : 09950-60010
09951-00470
SST : 09950-70010
09951-07100
(b) Install the retainer plate with the 4 screws.