toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Removal and Replacement|Page 6770 > < Removal and Replacement|Page 6768
Page 6
background image

(d) Using a union nut wrench, tighten the pressure feed tube (return tube side).

Torque : 25 Nm (255 kgf-cm, 18 ft-lbf)

NOTICE:
Use the formula calculate special torque values for situations for situations where a union nut wrench is combined with a torque
wrench  
  See: Service Precautions.

3. CONNECT TIE ROD END SUB-ASSEMBLY LH

(a) Connect the tie rod end LH to the steering knuckle with the nut.

Torque : 69 Nm (704 kgf-cm, 51 ft-lbf)

(b) Install a new cotter pin.

HINT
Further tighten the nut up to 60° if the holes for the cotter pin are not aligned.

4. CONNECT TIE ROD END SUB-ASSEMBLY RH

HINT
Use the same procedures described for the LH side.

5. CONNECT NO. 2 STEERING INTERMEDIATE SHAFT SUB-ASSEMBLY

(a) Align the matchmarks on the No. 2 steering intermediate shaft and power steering gear.

(b) Install the bolt.

Torque : 35 Nm (360 kgf-cm, 26 ft-lbf)

6. INSTALL ENGINE ASSEMBLY

(a) for 3UR-FE:

Install engine assembly    See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and Replacement/Engine
Assembly/Installation.

(b) for 3UR-FBE:

Install engine assembly    See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and Replacement/Engine
Assembly/Installation.

(c) for 1UR-FE:

Removal and Replacement|Page 6770 > < Removal and Replacement|Page 6768