Sequoia 4WD V8-4.6L (1UR-FE) (2010)
![background image](/toyota/sequoia_4wd/v8-4.6l_(1ur-fe)/Page-2109006.png)
(d) Using a union nut wrench, tighten the pressure feed tube (return tube side).
Torque : 25 Nm (255 kgf-cm, 18 ft-lbf)
NOTICE:
Use the formula calculate special torque values for situations for situations where a union nut wrench is combined with a torque
wrench See: Service Precautions.
3. CONNECT TIE ROD END SUB-ASSEMBLY LH
(a) Connect the tie rod end LH to the steering knuckle with the nut.
Torque : 69 Nm (704 kgf-cm, 51 ft-lbf)
(b) Install a new cotter pin.
HINT
Further tighten the nut up to 60° if the holes for the cotter pin are not aligned.
4. CONNECT TIE ROD END SUB-ASSEMBLY RH
HINT
Use the same procedures described for the LH side.
5. CONNECT NO. 2 STEERING INTERMEDIATE SHAFT SUB-ASSEMBLY
(a) Align the matchmarks on the No. 2 steering intermediate shaft and power steering gear.
(b) Install the bolt.
Torque : 35 Nm (360 kgf-cm, 26 ft-lbf)
6. INSTALL ENGINE ASSEMBLY
(a) for 3UR-FE:
Install engine assembly See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and Replacement/Engine
Assembly/Installation.
(b) for 3UR-FBE:
Install engine assembly See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and Replacement/Engine
Assembly/Installation.
(c) for 1UR-FE: