Sequoia 4WD V8-4.6L (1UR-FE) (2010)
Replacement/Front Propeller Shaft Assembly/Removal.
5. REMOVE FRONT DRIVE SHAFT ASSEMBLY LH
(a) Remove the front drive shaft See: Drive Axles, Bearings and Joints/Axle Shaft Assembly/Service and Repair/Removal and
Replacement/Front Drive Shaft Assembly/Removal.
6. REMOVE FRONT DRIVE SHAFT ASSEMBLY RH
HINT
Use the same procedure as the LH side.
7. REMOVE FRONT DIFFERENTIAL CARRIER ASSEMBLY
(a) Remove the bolt and disconnect the front differential breather tube bracket.
(b) Disconnect the automatic disconnecting differential actuator hose.
(c) Disconnect the automatic disconnecting differential actuator connector.
(d) Support the front differential with a jack.
(e) Remove the A, B, C, D and E bolts.
(f) Slowly lower the jack, and remove the front differential carrier.
(g) Remove the F and G bolts, and differential support.
Installation
AXLE AND DIFFERENTIAL: FRONT DIFFERENTIAL CARRIER ASSEMBLY (for 4WD): INSTALLATION
1. INSTALL FRONT DIFFERENTIAL CARRIER ASSEMBLY
(a) Install the differential support with the F and G bolts.
Torque : 100 Nm (1019 kgf-cm, 74 ft-lbf)
(b) Using a jack, slowly raise the front differential carrier assembly to its installation position.
(c) Temporarily install the A, B, C, D and E bolts.
(d) Tighten the A bolt.
Torque : 120 Nm (1224 kgf-cm, 89 ft-lbf)