Sequoia 4WD V8-4.6L (1UR-FE) (2010)
Drive/Propeller Shaft: Overhaul
Disassembly
DRIVE SHAFT / PROPELLER SHAFT: FRONT PROPELLER SHAFT ASSEMBLY: DISASSEMBLY
1. INSPECT FRONT PROPELLER SHAFT ASSEMBLY See: Testing and Inspection/Component Tests and General Diagnostics/Front Propeller
Shaft Assembly
2. INSPECT UNIVERSAL JOINT SPIDER BEARING See: Testing and Inspection/Component Tests and General Diagnostics/Front Propeller
Shaft Assembly
3. REMOVE FRONT PROPELLER SHAFT UNIVERSAL JOINT SPIDER
(a) Place matchmarks on the universal joint flange yoke and propeller shaft's universal joint flange yoke.
(b) Using a brass bar and hammer, slightly tap in the universal joint spider bearing.
(c) Using needle-nose pliers, remove the 4 hole snap rings from the grooves.
(d) Using SST, push out the universal joint spider bearing from the shaft's universal joint flange yoke.
SST : 09332-25010
HINT
Before installing SST, sufficiently raise the part labeled A. If part A is too low, SST may be difficult to install.
(e) Clamp the universal joint spider bearing in a vise and tap off the propeller shaft with a hammer.