toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Air Injection Control Valve|Testing and Inspection|Page 3031 > < Air Injection Control Valve|Testing and Inspection|Page 3029
Page 4
background image

a. Connect the 2 vacuum hoses to the No.2 air switching valves.
b. Install 2 new gaskets and 2 No.2 air switching valves with the 4 bolts to the rear water by-pass joint.

Torque: 10 N.m (102 kgf.cm, 7 ft.lbf) 

c. Install 2 new gaskets, and connect the 2 No.3 air tubes with the 4 bolts to the No.2 air switching valve.

Torque: 10 N.m (102 kgf.cm, 7 ft.lbf) 

d. Install the 2 new gaskets, and connect the 2 No.3 air tubes with the 4 nuts to the exhaust manifold.

Torque: 10 N.m (102 kgf.cm, 7 ft.lbf) 

3. INSTALL AIR PUMP

a. Install the air pump assembly with the 4 bolts.

Torque: 16 N.m (163 kgf.cm, 12 ft.lbf) 

b. Connect the pressure sensor connector for the air injection system.
c. Connect the air switching valve connector.
d. Connect the air hose No.2 to the air switching valve.

4. INSTALL VSV FOR AIR INJECTION SYSTEM

Air Injection Control Valve|Testing and Inspection|Page 3031 > < Air Injection Control Valve|Testing and Inspection|Page 3029