Sequoia 4WD V8-5.7L (3UR-FE) (2009)
(f) Turn SST 1-B, and remove SST 1-A and B.
(g) Remove the pulley nut and pulley.
2. REMOVE GENERATOR REAR END COVER
(a) Place the generator on the pulley.
(b) Remove the 3 nuts and end cover.
(c) Remove the terminal insulator.
3. REMOVE GENERATOR BRUSH HOLDER ASSEMBLY
(a) Remove the 2 screws and brush holder.
4. REMOVE GENERATOR COIL ASSEMBLY
(a) Remove the 4 bolts.