Sequoia LTD 4WD V8-4.7L (2UZ-FE) (2001)
(a) Remove the 4 screws and 2 brackets.
(b) Pry out the packings.
HINT: At the time of installation, please refer to the following item.
Do not refuse the packing.
(c) Using a hexagon wrench (5.0 mm, 0.20 in.), remove the 2 bolts.
Torque: 5.4 Nm (55 kgf-cm, 48 in.-lbf)
(d) Remove the 3 bolts.
(e) Lift the A/C unit until the tube and accessary is removed.
(f) Remove the tube and accessary.
13. REMOVE EVAPORATOR
(a) Remove the 8 screws and cover.
(b) Pull out the evaporator.
INSTALLATION
Installation is in the reverse order of removal.