Sequoia LTD 4WD V8-4.7L (2UZ-FE) (2001)
2. Apply battery positive voltage across the terminals.
3. Check that air flows from ports.
If operation is not as specified, replace the VSV.
3. REINSTALL VSV
2. Apply battery positive voltage across the terminals.
3. Check that air flows from ports.
If operation is not as specified, replace the VSV.
3. REINSTALL VSV