Sequoia LTD 4WD V8-4.7L (2UZ-FE) (2001)
4. CONNECT VSV FOR EVAP TO UPPER INTAKE MANIFOLD
a. Install the accelerator cable clamp and VSV for the EVAP to the upper intake manifold.
b. Connect the EVAP hose.
c. Connect the VSV connector for the EVAP.
5. INSTALL THROTTLE BODY COVER BRACKET
Install the throttle body cover bracket with the bolt.
6. INSTALL ACCELERATOR CABLE BRACKET
a. Install the accelerator cable bracket with the 2 nuts.
Torque: 18 N.m (185 kg.cm, 13 ft.lb)
b. Connect the accelerator cable to the engine.
7. INSTALL FUEL PRESSURE PULSATION DAMPER
8. INSTALL INTAKE AIR CONNECTOR
9. INSTALL THROTTLE BODY COVER