Sequoia LTD 4WD V8-4.7L (2UZ-FE) (2001)
1. Install the 2 nuts to the side airbag assembly.
2. Wind the wire harness around the stud bolts of the side airbag assembly as shown in the illustration.
3. Position the side airbag assembly inside the tire with the airbag deployment direction facing inside.
Tire size: Must exceed the following dimensions-
Width: 185 mm (7.28 in.)
Inner diameter: 360 mm (14.17 in.)
CAUTION:
-
Make sure the wire harness is tight. It is very dangerous when a loose wire harness results in the side airbag assembly coming free due to
the shock from the airbag deploying.
-
Always tie down the side airbag assembly with the airbag deployment side facing inside.
NOTE: The tire will be marked by the airbag deployment, so when disposing of the airbag use a redundant tire.