Sequoia LTD 4WD V8-4.7L (2UZ-FE) (2001)
e. To loosen the pulley nut, turn SST (A) in the direction shown in the illustration.
NOTE: To prevent damage to the rotor shaft, do not loosen the pulley nut more than one half of a turn.
f.
Remove the generator from SST (C).
g. Turn SST (B), and remove SST (A and B).
h. Remove the pulley nut and pulley.
6. REMOVE RECTIFIER END FRAME
a. Remove the 3 nuts.
b. Using SST remove the rectifier end frame.
SST 09286-46011
c. Remove the generator washer from the rectifier end frame.
7. REMOVE ROTOR FROM DRIVE END FRAME
REASSEMBLY
1. PLACE DRIVE END FRAME ON PULLEY
2. INSTALL ROTOR TO DRIVE END FRAME
3. INSTALL RECTIFIER END FRAME