Sequoia LTD 4WD V8-4.7L (2UZ-FE) (2001)
Torque: 2.94 N.m (30 kgf.cm, 26 in..lbf)
c. Install the cord clip with the nut.
Torque: 5.4 N.m (55 kgf.cm, 48 in..lbf)
d. Place the seal plate on the rectifier end frame.
e. Place the voltage regulator and brush holder on the rectifier end frame.
NOTE: Be careful of the brush holder installation direction.
f.
Install the 5 screws.
Torque: 1.96 N.m (20 kgf.cm, 17 in..lbf)
g. Place the brush holder cover on the brush holder.