Sequoia LTD 4WD V8-4.7L (2UZ-FE) (2001)
2. CONNECT LOWER BALL JOINT TO LOWER SUSPENSION ARM
Connect the lower ball joint and install the nut and a new cotter pin.
Torque: 140 Nm (1,450 kgf-cm, 103 ft. lbs.)
If the holes for the cotter pin are not aligned, tighten the nut further up to 60°.
3. CONNECT SHOCK ABSORBER TO LOWER SUSPENSION ARM
Torque: 135 Nm (1,400 kgf-cm, 100 ft. lbs.)
4. CONNECT STABILIZER BAR LINK TO LOWER SUSPENSION ARM
Torque: 69 Nm (700 kgf-cm, 51 ft. lbs.)
HINT: If the ball joint turns together with the nut, use a hexagon (6 mm) wrench to hold the stud.
5. INSTALL POWER STEERING GEAR
Torque:
A bolt: 165 Nm (1,700 kgf-cm, 122 ft. lbs.)
B nut: 130 Nm (1,350 kgf-cm, 96 ft. lbs.)
C bolt and nut: 165 Nm (1,700 kgf-cm, 122 ft. lbs.)
6. CONNECT RIGHT-HAND AND LEFT-HAND TIE ROD ENDS
Connect the Right-Hand and Left-Hand tie rod ends to the lower ball joints with the nuts and new cotter pins.
Torque: 91 Nm (930 kgf-cm, 67 ft. lbs.)
If the holes for the cotter pin are not aligned, tighten the nut further up to 60°.
7. INSTALL RIGHT-HAND AND LEFT-HAND FRONT WHEELS
Torque: 110 Nm (1,150 kgf-cm, 83 ft. lbs.)
8. CHECK FRONT WHEEL ALIGNMENT
Upper