toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Heater Core|Testing and Inspection|Page 7051 > < Heater Core|Testing and Inspection|Page 7049
Page 13
background image

b. Install the 13 clamps.
c. Connect the connectors.
d. Install the 4 nuts.

Torque: 7.3 Nm (74 kgf.cm, 65 in.lbf)

47. INSTALL AIR CONDITIONING UNIT ASSY

a. Install the air conditioner unit assy withe the 3 bolts and 2 nuts.

48. INSTALL SHIFT LOCK CONTROL UNIT ASSY
49. CONNECT TRANSMISSION CONTROL CABLE ASSY
50. INSTALL STEERING COLUMN ASSY
51. INSTALL INSTRUMENT PANEL SUB-ASSY W/PASSENGER AIRBAG ASSY

52. INSTALL SUCTION HOSE SUB-ASSY

a. Lubricate a new O-ring with compressor oil and install it on the hose.

Compressor oil: ND-OIL 8 or equivalent

b. Install the suction hose sub-assy and the piping clamp.

Heater Core|Testing and Inspection|Page 7051 > < Heater Core|Testing and Inspection|Page 7049