toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Evaporative Emission Control Canister|Testing and Inspection|Page 3205 > < Evaporative Emission Control Canister|Testing and Inspection
Page 2
background image

c. Inspect the air tightness.

1. With the vent and air inlet ports closed, apply vacuum (3.43 kPa, 25.7 kgf/sq.cm, 1.01 psi) to the purge port, and check that the vacuum

remains stable for 1 minute.

HINT:  In order to maintain air tightness, this operation should be performed with the CCV terminal ports closed by your fingers. If
operation is not as specified, replace the charcoal canister.

d. Inspect the diaphragm.

1. Remove the air hose between ports A and B.
2. With the vent, purge and air inlet ports closed, apply vacuum (1.42 kPa, 11 mmHg, 0.42 in.Hg) into port A, and check that air is sucked in

from port B.

3. With the vent, purge and air inlet ports closed, apply vacuum (1.42 kPa, 11 mmHg, 0.42 in.Hg) into port A, and measure how long it

takes for vacuum to drop.

Vacuum drop time: 10 sec. or more

If operation is not as specified, replace the charcoal canister.

4. Reinstall the air hose between ports A and B.

e. Inspect VSV for open circuit.

Evaporative Emission Control Canister|Testing and Inspection|Page 3205 > < Evaporative Emission Control Canister|Testing and Inspection