toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Shift Cable, A/T|Service and Repair|Page 3688 > < Shift Cable, A/T|Service and Repair|Page 3686
Page 5
background image

c. When installing the transmission control cable assembly on the shift lever plate, place the projection of the shift cable downward to fit in the

groove of the shift lever plate (FIG.2)
Confirm that the spring in the shift cable outer has moved to the position (FIG.3) shown in the illustration.
Confirm that the shift cable is installed on the shift lever plate properly.

NOTICE: 
^

To prevent torsion of the inner cable, the projection on the eye end should face rear.

^

Push the cable end to the bottom of the pin.

d. Install the transmission control cable assembly and 2 nuts.

Torque: 12 Nm (122 kg-cm, 9 ft. lbs.)

e. Connect the transmission control cable assembly to the transmission control cable bracket No.2.

f.

Temporarily install the transmission control cable assembly to the control shaft lever with the nut.

Shift Cable, A/T|Service and Repair|Page 3688 > < Shift Cable, A/T|Service and Repair|Page 3686