toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Differential Carrier|Disassembly|Page 3770 > < Differential Carrier|Disassembly|Page 3768
Page 10
background image

c. Using SST to hold the flange, torque the nut.

SST 09330-00021
Torque: 108 Nm (1,100 kg-cm, 80 ft. lbs.)

24. INSTALL DIFFERENTIAL DRIVE PINION PRELOAD

a. Using a torque wrench, measure the preload of the drive pinion.

Torque:

New bearing 1.1 to 1.7 Nm (1.1 to 1.7 kg-cm, 9.6 to 14.8 inch lbs.)
Reused bearing  0.6 to 0.9 Nm (6 to 9 kg-cm, 5.2 to 7.8 inch lbs.)

^

If the preload is greater than the specification, replace the bearing spacer.

^

If the preload is less than the specification, replace the nut with 13 Nm (130 kg-cm, 9 ft. lbs.) of torque at a time until the specified preload
is reached.

Torque: 235 Nm (2,400 kg-cm, 174 ft. lbs.)
If the torque exceeds the maximum while retightening the nut, replace the bearing spacer and repeat the preload adjusting procedure.

NOTICE:  Do  not loosen the pinion nut to reduce the preload.

HINT:  This preload is within the backlash between the drive pinion and ring gear.

25. INSPECT TOTAL PRELOAD

a. Using a torque wrench, measure the preload.

Torque:

Total preload 0.3 to 0.5 Nm (3 to 5 kg-cm, 2.6 to 4.3 inch lbs.)

26. INSPECT DIFFERENTIAL RING GEAR BACKLASH

a. Using a dial gauge, check the backlash of the ring gear.

Differential Carrier|Disassembly|Page 3770 > < Differential Carrier|Disassembly|Page 3768