Solara L4-2.4L (2AZ-FE) (2006)
REMOVAL
INSTALLATION
-
Temporarily install the new parts and measure each part of the new parts in accordance with the body dimension diagram. (See the body dimension
diagram)
-
Inspect the fitting of the related parts around the new parts before welding. This affects the appearance of the finish.
-
After welding, apply the polyurethane foam to the corresponding parts.
-
After welding, apply body sealer and under-coating to the corresponding parts.
-
After applying the top coat layer, apply anti-rust agent to the inside of the necked section structural weld spots.