toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Evaporative Emission Control Canister|Testing and Inspection|Page 3157 > < Evaporative Emission Control Canister|Testing and Inspection
Page 2
background image

3. While holding the air inlet port closed, apply vacuum (3.43 kPa (25.7 gf/sq.cm, 1.01 psi)) to the vent port, and check that air is sucked into the

purge port.

If the result is not as specified, replace the charcoal canister.

c. Check the air tightness.

1. While holding the vent and air inlet ports closed, apply vacuum (3.43 kPa (25.7 gf/sq.cm, 1.01 psi)) to the purge port, and check that the

vacuum is maintained for 1 minute.

HINT:  In order to maintain air tightness, the check should be performed while holding the VSV terminal port closed.

If the result is not as specified, replace the charcoal canister.

d. Check the diaphragm.

1. Remove the air hose between ports A and B.
2. While holding the vent, purge and air inlet ports closed, apply vacuum (1.42 kPa (11 mmHg, 0.42 in.Hg)) into port A, and check that air is

sucked in from port B.

Evaporative Emission Control Canister|Testing and Inspection|Page 3157 > < Evaporative Emission Control Canister|Testing and Inspection