Solara L4-2.4L (2AZ-FE) (2006)
a. Measure the resistance between the terminals when the switch is ON and when it is OFF.
INSTALLATION
1. INSTALL CLUTCH START SWITCH ASSEMBLY
a. Install the clutch start switch assembly with the nut.
Torque: 16 Nm (160 kgf-cm, 12 ft. lbs.)
b. Connect the clutch start switch assembly connector.
2. INSPECT CLUTCH START SWITCH ASSEMBLY