Supra L6-183 2997cc 3.0L DOHC (2JZ-GE) (1993)
(a) Disconnect the VAF meter connector.
(b) Disconnect the VAF meter wire from the wire clamp on the bracket.
(c) Remove the 4 nuts, bolt, VAF meter and gasket.
VAF METER INSTALLATION PROCEDURES
1. INSTALL VAF METER FROM AIR CLEANER.
(a) Install a new gasket and the VAF meter with the 4 nuts and bolt.
Torque: 10 Nm (7 ft.lb)
(b) Connect the VAF meter connector.
(c) Install the VAF meter wire to the wire clamp on the bracket.
2. INSTALL INTAKE AIR CONNECTOR PIPE.
(a) Install the air connector pipe with the 2 hose clamps.
(b) Connect the following hoses: