Supra L6-2997cc 3.0L DOHC MFI (1998)
3. INSPECT FLEXIBLE COUPLING CENTERING BEARING
Check for damage to the bushing.
If the bushing is damaged, replace the propeller shaft assembly.
4. INSPECT RUNOUT OF INTERMEDIATE SHAFT AND PROPELLER SHAFT
Maximum runout: 0.8 mm (0.031 in.)
If the runout is greater than the maximum, replace the propeller shaft assembly.
5. INSPECT SPIDER BEARING
(a) Check if the spider bearing rotates smoothly.
(b) Check if there any play in the spider bearing.
If necessary, replace the propeller shaft assembly.
REPLACEMENT
NOTICE: Be careful not to grip the propeller shaft tube too tightly in the vise as this will cause deformation.
1. 2JZ-GE:
REPLACE CENTER SUPPORT BEARING
(a) Separate the propeller shaft and intermediate shaft.